Charger Factory & Production

Capacity, platform and process are the three claims every factory makes and the three that are hardest to check. This guide covers how to compare manufacturers and how to plan production slots so your launch date holds.

SMT and assembly lines Platform and capacity data Audit checklists included
WECENT GaN 65W travel charger produced on the factory GaN platform
Start here

Three routes, and you only need one of them

Choosing a factory, verifying one you have already chosen, and planning a production run are three different jobs. Start with the one you are actually doing.

Comparing factories

The three claims that are worth checking

Every factory says the same five things. Only three of them are checkable before you place an order.

Lines and shift pattern

Monthly capacity is lines multiplied by shift pattern. A single number tells you nothing until you know how many shifts it assumes and what else is already booked into them.

Where the test happens

In-line electrical testing is standard. What varies is whether reliability and safety testing happens in-house or is outsourced, and that changes the failure feedback loop.

Capacity and schedule

Why launch dates slip inside a factory calendar

Almost every delay in a charger programme comes from one of three places: tooling, a shared line, or a festival.

Tooling has its own clock

Tooling lead time does not compress the way production time does. It is a physical process, and starting it late moves everything behind it.

Lines are shared

Your run sits next to someone else’s. Slots are booked weeks ahead, and a change to the specification after booking usually means losing the slot.

Calendar, not just capacity

Lunar New Year and the pre-holiday peak reshape the calendar more than any capacity number. Build the plan around them rather than discovering them at booking.

The framework

What actually decides whether the date holds

01

When tooling starts, not when the order is placed

The order is a commercial event. Tooling is the physical one, and the delivery date follows it.

02

Whether the slot was booked around a festival

A slot that overlaps the New Year shutdown is not a slot. Confirm the working calendar before accepting the date.

03

How many approvals sit between sample and production

Each approval gate is a round trip. Counting the gates is more accurate than counting the days.

04

Whether the factory makes the components or buys them

Vertical integration shortens the critical path. Where it does not exist, the component supplier becomes part of your lead time.

FAQ

Factory and production questions

How do I evaluate a charger factory before ordering?

Ask for the platform list with wattage ranges, the line count and shift pattern behind the capacity figure, and where in-line testing and reliability testing happen. Those three answers tell you more than any certificate.

What does factory capacity actually mean?

It is lines multiplied by shift pattern, minus what is already booked. A headline monthly figure without the shift assumption and the current load is a marketing number rather than a planning number.

How far ahead should I book production?

Book the slot as soon as the sample is approved, and confirm the working calendar at the same time. Tooling should start before the slot is booked, because it is the longest single item in the schedule.

Is a China factory always cheaper?

Not automatically, once duty, freight and the cost of managing a longer supply chain are counted. What China usually offers is platform depth — the ability to re-specify an existing design instead of tooling a new one.

What should a factory audit cover?

Process control, incoming inspection, in-line testing, traceability and how defects are closed out. An audit that only checks certificates verifies paperwork, not production.